Publications Repository - Gdańsk University of Technology

Page settings

polski
Publications Repository
Gdańsk University of Technology

Treść strony

Design of Inner Gate for CRIST Shipyard Dry Dock

The paper deals with a removable steel inner gate which was designed to separate two parts of a dry dock of about 70 m in width and 380 m in length. The gate allows for independent assembly of ship structures in two separated parts of the dock. The fore part of the dock can be flooded while the after part is dry. Tthe gate was designed by IDEK Company Ltd in 2011 and it was soon constructed and used by CRIST Shipyard in Gdynia.

Authors

Additional information

DOI
Digital Object Identifier link open in new tab 10.2478/v10012-012-0007-5
Category
Publikacja w czasopiśmie
Type
artykuł w czasopiśmie wyróżnionym w JCR
Language
angielski
Publication year
2012

Source: MOSTWiedzy.pl - publication "Design of Inner Gate for CRIST Shipyard Dry Dock" link open in new tab

Portal MOST Wiedzy link open in new tab