EHV transmission lines wires location on line operation issues - case studies

Transmission lines towers construction affects the line parameters and influences on its operation in the future. Misguided design of the tower can lead to serious problems such as overvoltages, electric arc extinction difficulties, voltage asymmetry, resonance phenomena or increasing of magnetic field near the line. The paper points out those threats on example of 400 kV double circuit overhead transmission line with shunt reactors. The paper discuses the impact of circuits orientation of the transmission line, phase wires arrangement and line transpositions on above problems. The study includes steady state analyses and transient analyses (EMT simulations).

Authors

Additional information

DOI
Digital Object Identifier link open in new tab 10.1109/ptc.2015.7232305
Category
Aktywność konferencyjna
Type
materiały konferencyjne indeksowane w Web of Science
Language
angielski
Publication year
2015

Source: MOSTWiedzy.pl - publication "EHV transmission lines wires location on line operation issues - case studies" link open in new tab

Portal MOST Wiedzy link open in new tab