In 2015 a connection between the Polish and Lithuanian power systems become fully operational. The connection consists of a 400 kV double circuit transmission line and a back-to-back HVDC substation located on the Lithuanian side. A magnetic couplings between the circuits of the transmission line cause that during power transmission a different values of active power losses are observed in both circuits. This situation may cause a financial settlement problems for transmitted energy between the operators of the connected systems.
Authors
Additional information
- DOI
- Digital Object Identifier link open in new tab 10.1109/eem.2018.8469863
- Category
- Aktywność konferencyjna
- Type
- materiały konferencyjne indeksowane w Web of Science
- Language
- angielski
- Publication year
- 2018