In the rural areas building of sewerage systems and central wastewater treatment plants (WWTPs) often brings too high costs, due to high distances from one farm to another and terrain configuration. Individual treatment systems for each farm are a good solution. The teratment wetlands for nine individual farms were constructed in Kaszubian Lake District in summer and autumn 2009. Three configurations of reed beds were chosen. In the paper design criteria and results from two years of operation are presented. The average BOD removal varied from 64 to 92% and N removal from 44 to 77%. Individual construction of the treatment facilities by farmers under the supervision of technical personnel make the framers aware of the significance of each element of the treatment process and guarantees proper future operation of the system.
Autorzy
Informacje dodatkowe
- DOI
- Cyfrowy identyfikator dokumentu elektronicznego link otwiera się w nowej karcie 10.1007/978-94-007-2953-7_9
- Kategoria
- Aktywność konferencyjna
- Typ
- materiały konferencyjne indeksowane w Web of Science
- Język
- angielski
- Rok wydania
- 2012